SWA Water Shines at the Weld Australia – 2023 Welding Excellence Awards
The evening of October 25, 2023, was an unforgettable one for SWA Water as we took part in Weld Australia’s – 2023 Welding Excellence Awards. The ceremony, hosted at the Waterview in Sydney’s Bicentennial Park, was a wonderful celebration of innovation, engineering excellence, and environmental stewardship.
SWA Water’s Entry for “PROJECT OF THE YEAR”
SWA Water proudly entered our project for the coveted “PROJECT OF THE YEAR” award and is delighted to share that we secured the honourable position of ‘Runner Up’ at the prestigious Weld Australia – 2023 Welding Excellence Awards. Top of Form
Join us in celebrating this achievement, and let SWA Water be your partner in environmental excellence. Contact us today to explore how we can assist you in your wastewater treatment needs and contribute to a more sustainable future.
Project Description: A Sustainable Partnership
Our entry in the competition revolved around a transformative collaboration with Saputo Dairy Australia Pty Ltd, one of the leading dairy producers in the country. Their Allansford facility in Victoria required a sustainable solution for treating the wastewater it generated. As the main contractor for this project, SWA Water was entrusted with the task of enhancing solids removal from the effluent, ensuring compliance with stringent environmental regulations, and lightening the load on the local sewerage treatment plant.
The project entailed the design, manufacturing, installation, commissioning, and delivery of a state-of-the-art Dissolved Air Flotation (DAF) plant. This innovative solution incorporated ferric chloride coagulation, followed by flocculation and DAF processes, enabling the plant to effectively treat a flowrate of 300 m3/h (up to 7,200 m3/d) of wastewater.
Project Highlights
-
Design: Our expert team conducted detailed design work at our Sydney office, ensuring the project’s success.
-
Manufacturing: SWA Water manufactured the DAF Unit and associated equipment using top-quality materials.
-
Installation: The DAF plant was installed, tested, and commissioned at Saputo’s Allansford site.
-
Scale: The DAF unit measured 20.75m long x 4.35m wide x 3.85m high, weighing a substantial 18 tonnes.
-
Success: The project exceeded Saputo’s expectations and delivered exceptional wastewater treatment results.
This project marked our second successful collaboration with Saputo, following the construction of a 40 m3/h DAF Treatment plant at their Erskine Park milk processing facility in Sydney.
Our Commitment to Sustainability
At SWA Water, we’re committed to sustainable practices. In our Sydney factory, we’ve taken bold steps to reduce our carbon footprint and operational costs. We’ve installed more than 100 solar panels, generating surplus electricity and reducing our energy bills by over 95%. Our integrated approach aligns environmental concerns with business development, making us a responsible and forward-thinking partner.
Contact SWA Water for a Free Consultation
SWA Water’s award-winning recognition in designing and manufacturing customised industrial wastewater treatment equipment places us at the forefront of our field. With a global presence and an unwavering focus on sustainability, we are leading the way toward a greener and more responsible industrial future. Email or call us on 02 9773 0845 to arrange a consultation and discuss your project requirements. Located at 9/9 Fitzpatrick St, Revesby NSW. Together, we can pave the path to a more sustainable and environmentally responsible future.