SWA WATER NEWSLETTER MAY 2017

SWA WATER MALAYSIA and SWA WATER THAILAND.

SWA WATER (MALAYSIA) Sdn Bhd
PRINCIPALS:
KHAILASH VELAUTHAM
TAMARAI MUTHUSAMY

AERATION TANK 2: TURNKEY PROJECT

The above images are of SWA Malaysia’s current project.
The following images are of historic projects.

Waste water plant for gas terminal in Kertih, Terengganu.
Completed 2016.

KUALA LUMPUR INTERNATIONAL AIRPORT.

The above images are from the installation under the new runway at Kuala Lumpur International Airport. Completed 2013.

Oil Terminal Upgrade Project: Miri – East Malaysia

More than 100 tonnes of equipment requiring 7 x 40 foot containers was manufactured by SWA Water at its Sydney factory.

SWA WATER THAILAND LTD

PRINCIPAL:
SUMALEE CHAIKIJJA


Sumalee Chaikijja has managed SWA Thailand for more than 10 years and has successfully completed many projects. The following images are of projects Sumalee has managed.

This is where it all begins.

The above two images are from a power station in North Bankok. The stainless steel units were manufactured in SWA’s Sydney factory.

The above three images are from a Petrochemical plant at Rayong, Thailand.

SWA Water Australia manufactured one CC-50-SS304 Oil Separator and one SWA-DAF-50-SS304. Dissolved Air Flotation unit.
The units were shipped, installed, tested and commissioned by engineers employed by SWA Thailand.

The image below is an on site inspection by the Managing Director of the SWA Water Group of Companies, John Meyers.
Another successfully completed project.

The directors of SWA Water Australia would like to acknowledge the professionalism, dedication and the expertise of the Principals of SWA MALAYSIA and SWA THAILAND and their staff.

If your company is considering a new project in Malaysia or Thailand, contacting KHAILASH or TAMARAI (MALAYSIA) or SUMALEE (THAILAND) will be an excellent  start to your project.
e: khailash@swawater.com.au (Malaysia) or
e: sumalee@swawater.com.au (Thailand)

Kind Regards,
John Meyers
Sarah Chi
Richard Meyers