50 SWA Case History – Rotary Eng – Fujairah Oil Terminal – CPI-DAF50EX 2014

SWA PROJECT CASE HISTORIES

Project Reference #50: Fujairah Oil Terminal FZC.
Fujairah, UAE.
Name of Client Fujairah Oil Terminal FZC
Name of Project FOT DAF Plant
Location Fujairah, UAE
Type of Industry Oil Terminal
Year commenced 2014
Year completed 2014
Brief Description This project was awarded by Rotary Engineers Singapore to SWA Water Australia for the design, manufacture, supply and commissioning of 1 x 50 m3/h CPI Oil Separator integrated generic premarin with Dissolved Air Flotation Unit, all EXD rated & made from SS304 stainless steel.
Performance Test Inlet conditions:

  • Flow rate: 50 m3/h
  • Inlet Oil: 2,000 ppm
  • SG Oil: 0.90
  • Water Temperature: 30 C
  • Outlet Oil Required: < 10 ppm
  • Outlet Oil Achieved under test: < 1 ppm
01 SWA 50 m3/h Integrated CPI Oil Separator & DAF Unit, EXD rated.

01 SWA 50 m3/h Integrated CPI Oil Separator & DAF Unit, EXD rated.